Sunday, July 12, 2009

To Do List...

Ok, while I'm watching R2LA's build day, figured it would help me out to make a to-do list.

1. Shave down the bottom of the ankle and the cylinder holder so the outer feet will sit level with the ground.

2. Swap out the chain drive motors for the belt drive system and test it.

3. Prime and paint the HPs, logic surrounds and coin slots silver.

4. Prime and krider the radar eye, LDP and possibly the coin slots.

5. Remove the skins to mount the coin slots. there's a speaker in the way...

6. Remount the inner skins and mount the coin returns, power couplers, octagon ports.

7. Remount the outer skins and mount the side vents and pocket vents.

8. Mount the center vents to the surround and mount that to the frame.

9. Mount the LDP

10. Cut holes in the dome for the HPs, logics, buttons and radar eye (maybe)

11. Mount the parts listed in 10.

12. Glue the domes together

13. Glue the panels on

14. mount the dome to the HDPE ring

15. remount the dome motor

16. remount the voice electronics

17. mount the electronics in the dome

18. make a slip ring from a 1/4" mono jack

19. wire power to the dome through the jack.

I'm quite sure that's not everything, but it's all I can think of at the moment. Some of the things are a 30 sec job while others will take several days.

No comments: